Ink elevation of a two-storey Maldivian residence with a deep verandah, louvred upper floor and two coconut palms.

TAP A MARK TO SEE THE CHECK

DESIGN AT THE SPEED OF THOUGHT

Synthera Studio is an architecture practice built on its own drafting engine. A brief goes in. An issue-ready set comes out, checked against the code before anyone sees it.

DISCOVER MORE
Shaded axonometric of a slender six-storey guesthouse tower with a red sun disc behind the parapet.

THE SLOW PART OF ARCHITECTURE WAS NEVER THE THINKING. IT WAS THE REDRAWING. WE BUILT AN ENGINE SO THE STUDIO NEVER REDRAWS.

LEARN MORE

FORMATS

EVERY SET ISSUES AS DXF, DWG AND VECTOR PDF FROM ONE MODEL, WITH IFC 4 AND A PRICED BILL OF QUANTITIES ALONGSIDE.

  • DXF
  • DWG
  • PDF
  • IFC 4
  • BOQ
  • HBJSON

PROBLEMS

DRAWINGS ARE STILL MADE ONE LINE AT A TIME

Most architecture time is not design. It is redrawing what was already decided, then checking by eye what a rule could have checked. The Maldives builds fast. The paperwork does not.

  1. SLOW [01]

    A CONCEPT TAKES WEEKS TO BECOME A PLAN

    Every scheme is drawn by hand from a blank sheet, even the parts every guesthouse on every island shares.

  2. DRIFT [02]

    THE PLAN, THE SECTION AND THE BOQ DISAGREE

    Three documents, three copies of the same wall. Change one and the other two are wrong until someone notices.

  3. LATE [03]

    COMPLIANCE SHOWS UP AT SUBMISSION

    Cover, egress and sanitary counts are checked after the design is finished, when a fix costs the most.

  4. COSTLY [04]

    EVERY REVISION RESTARTS THE CLOCK

    A client moves one wall and the whole set is redrawn, re-dimensioned and re-scheduled by hand.

FROM THE FIRST LINE

TO THE LAST SHEET

EXAMPLE CHECK · 01

BS 8110-1 · TABLE 3.3

Nominal cover, very severe exposure

Occasional sea spray reaches almost every Maldivian site. Table 3.3 permits C40 at 50 mm, C45 at 40 mm or C50 at 30 mm. The common C25 at 25 mm is not compliant.

BLOCKS ISSUE

EXAMPLE CHECK · 02

ADA TABLE 404.2.4.1 · DOOR MANOEUVRING

Front approach, pull side

1525 mm clear depth with 455 mm beside the latch. A door drawn with 1200 mm does not clear. The engine reports it before the sheet exists.

BLOCKS ISSUE

EXAMPLE CHECK · 03

AD B VOL 2 · DEAD-END CORRIDOR

One-direction travel from a bedroom door

9 m maximum from a bedroom door to the storey exit in purpose group 2(b). A guest corridor that runs 15 m before a second route fails, and the plan is re-solved, not redlined.

BLOCKS ISSUE

INTRODUCTION

Architects in the Maldives spend most of a project redrawing what they already decided.

Most of that work is rule-based. Setbacks, door swings, clearances, schedules. It should not need a hand.

Synthera Studio runs on a drafting engine that states every fact once and derives the rest. A door is a distance along a wall. The jamb, the swing, the tag, the dimension and the clearance check all follow.

So the studio spends its time on the building, and the engine spends its time on the set.

[SCROLL TO CONTINUE]

[01]

ARCHITECTURE

Guesthouses, small resorts and residences from brief to tender set: space programme, concept, planning submission, drawings, schedules and bill of quantities. Every set is stamped by a separately retained registered architect.

START A PROJECT

[02]

DRAWING PRODUCTION AND COMPLIANCE REVIEW

For practices and developers. We turn your scheme into an issue-ready DXF, DWG and PDF set, or audit the set you already have against BS 8110, fire and egress, sanitary provision and Maldives regulation, with every finding traced to its clause.

SEND US A SET

WHY US

BUILT TO WORK THE WAY A SET GETS ISSUED

Synthera Studio fits the way Maldivian projects actually run. Fast decisions, tight plots, a council and a client who both wanted drawings yesterday.

  1. LISTEN

    The brief and the plot become a space programme with areas, adjacencies and a first cost

  2. SHAPE

    Parti, massing and orientation are set for sun, wind and privacy before a single wall is drawn

  3. DRAW

    The engine issues the full set: plans, sections, elevations, schedules and the bill of quantities

  4. PROVE

    Every sheet passes the standards audit, every finding named by its gate code and traced to its standard, before you ever see it

Ink drawing of a resort water villa on timber piles with a long jetty and one figure for scale.

USE CASES

MADE FOR THE BUILDINGS OF THE ISLANDS

  • Family houses on tight urban plots. Courtyards and verandahs do the cooling.

  • The studio's specialism. Keys, cores, cafes and the egress that goes with them.

  • Land and water villas, back of house, and the jetty in between.

  • Treatment rooms, accessible WCs, clean and dirty flows kept apart.

  • Workstation standards, daylight to every desk, a core that leaves the floor free.

  • Frontage, stock, staff and the sanitary count the rules demand.

  • Classrooms sized to the roll, shaded circulation, two ways out of everywhere.

  • Stacked plans that agree with their own sections, cores and services.

START HERE

MALDIVES · REMOTE FRIENDLY

BRING US A PLOT AND A BRIEF

On a guesthouse or a residence, the first concept, plan and cost typically come back in days rather than months. From there the engine carries the same model to the issued set.

CONTACT US